Complete an inspection

As an Inspection becomes complete, it's important to Complete the Inspection to attain an accurate and timely project.

Step by Step — Complete an Inspection

  1. From within a specific inspection, click on Update Status.
  2. Click on the Passed icon.
  3. In the subsequent pop-up window, type in an explanatory note.
  4. Click OK.
  5. In the next pop-up window, add your signature, if required.
  6. Click OK.
    • As a result, the Inspection item is shown as Passed